PAST PROJECTS

We are proud of all our achievements.

 

Press Review

http://www.lanouvelle.net/Economie/Construction-et-immobilier/2010-12-22/article-2062227/Noel-sur-le-chantier%21/1
St-Romain multipurpose building
Town of Saint-Romain

Multisport platform, turnkey project (2013).
 

  New plant
Agnico Eagle, Goldex Mine
Val d'Or

 
New backfill plant, 320 tons (2013).
 
     
     
Building
Tembec - Témiscamingue
 
Building for cogeneration plant,
636 tons (2013).
 
  Steel structures
Iron Ore Company of Canada ships
Port of Sept-Îles

 
Supplied steel structures to refurbish and upgrade conveyors to load Iron Ore Company of Canada ships at the Port of Sept-Îles (2012).
 
     
     
Victoriaville bicycle bridge
Excavation Marchand et Fils
 
Supply, fabrication, and erection of a bicycle bridge over the Bulstrode River in Victoriaville.

 
  Sept-Iles port facilities
Consolidated Thompson Iron Mines, Pointe-Noire, in Sept-Iles, Quebec
 
Design, drawings, fabrication, painting, and delivery of 2,500 tons of steel to Sept-Iles in 2009-2010.
 
     
     
Illuminated path along the Magog River Gorge
City of Sherbrooke
 
Reconstruction of footbridges and new lighting along the Magog River Gorge in downtown Sherbrooke (2009). Civil engineering work, fabrication, and installation of new footbridges, stairs, and railings.
 
  Terrebonne footbridge
Gelco Construction
 
Fabrication and erection of a 200 ft. footbridge over the Mascouche River in Terrebonne in 2009.
Watch the video
 

     
     
Tafisa expansion project
Lac-Mégantic
Tafisa Canada
 
Turnkey expansion of the plant and warehouse (2005-2006), including civil engineering work, fabrication and erection of steel structure, supply and installation of metal covering.
 
  Metal works on the Uniprix stadium
Génar Construction inc
 
Supply and installation of metal works on the Uniprix stadium (Parc Jarry), Montreal (2004)
 
     
     
Parc J. Cartier footbridge in Sherbrooke
Toulouse-Sherbrooke Excavation
 
Construction of a footbridge spanning the Magog River in Parc Jacques Cartier in Sherbrooke (2003). Turnkey project including shuttering and concreting of pile heads, and fabrication and erection of steel structure, slabs, and railings.
 
  Giant plant expansion
Giant plant - East Montreal
 
Plant expansion (2003). Turnkey project including concept, fabrication, and installation of metal structure and supply and installation of metal covering.
 
     
     
Other projects

Footpath on the J. Bizard
bridge (Gelco Construction)

Supply, manufacture, and installation of a new footpath on the Jacques Bizard bridge in Île Bizard (2008).
 
Parc d'affaires sur le golf
(Loracon Construction)

Supply, manufacture, and erection of a steel structure for an office building in Brossard (2008).

 
 

Development of Acier Fastech facilities

2013